Working working on the construction of the Bankhead Tunnel (134432 bytes)

 

 

 

These men are working on a section of the Bankhead Tunnel ca. 1940 prior to its being submerged beneath the Mobile River.  The completed tunnel is still heavily used.

Negative: N-5426

Previous Image Main Gallery Next Image